한국해양대학교

Detailed Information

Metadata Downloads

프로젝트 파이낸싱을 활용한 민자항만에서의 문제점과 개선방안에 관한 연구

DC Field Value Language
dc.contributor.author 송백호 -
dc.date.accessioned 2017-02-22T07:13:58Z -
dc.date.available 2017-02-22T07:13:58Z -
dc.date.issued 2012 -
dc.date.submitted 57014-05-25 -
dc.identifier.uri http://kmou.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002176132 ko_KR
dc.identifier.uri http://repository.kmou.ac.kr/handle/2014.oak/10484 -
dc.description.abstract the import and export cargo, transshipment cargo. In the early operation of port, the volume should be somewhat forecast conservatively because the problems come up a lot, for instance, Verification of new equipment, the settlement of additional service and after normally operation, Estimating volume according to the capability per berth would be more reasonable. Therefore, government needs to revise the port development project so that port supply can be adjusted. Secondly, Compensation provisions relating to violations of government support should be detailed. Project operators not are able to receive compensation because concession agreement signed government and private entrepreneur regarding the construction doesn't define detailed coverage and specific measuring range relating to violations of government support. Substantial financial support should be applied to project operators by clearly defining coverage and measuring range to pay by the government to operators in concession agreement. Thirdly, in case of refinancing, profit sharing should be excluded in the business without MRG. Sharing profits in MRG business should be shared with government because satisfactory financial arrangements became possible making the financial conditions better as the national economy improve. But project operator in the business without MRG should be excluded from profit sharing for refinancing because they take responsibility for all loses. Quantitative analysis of this study is a bit short because it accesses to only a literature survey and on-site interviews. But this study is important that it is to analyze some problems and to suggest improvements of private capital ports in scarce situation concerning private capital port through project financing. -
dc.description.abstract Pusan Newport phase1 project, Mokpo Newport project, Incheon North port project. However, Specific contents on Project financing of private investment port is not only much different by year, by thesis, by institution but also uncertain. So I analyze the data collected through actual person who induced by acquaintance in charge of project. The problems shown in the case of private capital port constructed through PF are as follows: completion delay, shortage of volume, mismatch between the supply and demand of port, immoderate marketing cost caused by excessive competition. I set up improvement plan by analyzing some problems through the case study of private investment port built by project financing. Improvement plan which should be reflected in construction of the port are as follows -
dc.description.abstract The purpose of this study is to look at risk factors, problems shown in the operational phase by Private capital port project financing case and to propose the improvement. In order to achieve the purpose of this study, I performed a literature search and actual case research through multiple cases -
dc.description.abstract Firstly, when the port is under construction, the demand and supply forecasting method should be improved. Estimating volume at the constructing time through private capital, the tariff should be segmented in accordance with classification -
dc.description.tableofcontents 제 1 장 서 론 제 1 절 연구의 배경과 목적 제 2 절 연구의 범위와 방법 제 2 장 이론적 배경 및 선행연구 제 1 절 프로젝트 파이낸싱의 개요 제 2 절 프로젝트 파이낸싱의 구성요소와 위험유형 제 3 절 프로젝트 파이낸싱과 민간투자사업 제 4 절 프로젝트 파이낸싱을 활용한 민자항만에 관한 선행연구 제 3 장 민자항만에서의 프로젝트 파이낸싱 사례와 문제점분석 제 1 절 조사대상 및 조사방법 제 2 절 민자항만에서의 프로젝트 파이낸싱의 사례 제 3 절 프로젝트 파이낸싱을 활용한 민자항만에서의 문제점 제 4 절 조사결과의 요약과 해석 제 4 장 프로젝트 파이낸싱을 활용한 민자항만에서의 개선방안 제 1 절 수요와 공급의 예측방법 개선 제 2 절 정부지원사항 위반시 보상규정 상세화 제 3 절 자금재조달시 MRG없는 사업에 대한 이익공유 제외 제 5 장 결 론 제 1 절 연구의 요약과 시사점 제 2 절 연구의 한계점과 향후 연구방향 -
dc.language kor -
dc.publisher 한국해양대학교 해사산업대학원 -
dc.title 프로젝트 파이낸싱을 활용한 민자항만에서의 문제점과 개선방안에 관한 연구 -
dc.title.alternative A study on the status and suggestions of project financing in Port construction -
dc.type Thesis -
dc.date.awarded 2012-12 -
dc.contributor.alternativeName Song -
dc.contributor.alternativeName Baek-Ho -
Appears in Collections:
항만물류학과 > Thesis
Files in This Item:
000002176132.pdf Download

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse