3차원 형상정보를 활용한 설계초기단계 선박용접물량 산출
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | 남종호 | - |
dc.contributor.author | 이정훈 | - |
dc.date.accessioned | 2019-12-16T02:42:27Z | - |
dc.date.available | 2019-12-16T02:42:27Z | - |
dc.date.issued | 2017 | - |
dc.identifier.uri | http://repository.kmou.ac.kr/handle/2014.oak/11388 | - |
dc.identifier.uri | http://kmou.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002331204 | - |
dc.description.abstract | These days, shipbuilding companies are making an effort to adopt the IT technology in order to improve the production efficiency. One such effort is to utilize a planning and scheduling system to predict the production cost in advance. In this system, assessing the welding material quantity is an important factor. Unfortunately, obtaining the welding material quantity in the early design stage is extremely difficult because the detailed production information, which is essential in deriving the cost associated with welding, is normally available at a later stage. This paper aims at developing a computerized program that produces an index to estimate the welding material quantity in the early design stage. By using only three-dimensional geometric information, the program analyzes the production process and estimates the welding material quantity at any design or production stage when no production information is available. The results can be used for the planning and scheduling system. | - |
dc.description.tableofcontents | 1. Introduction 2. Integrated Manufacturing Execution System 2.1 Overview 2.2 Functions 2.3 Reference Information System 2.3.1 WBS 2.3.1.1 Introduction 2.3.1.2 Composition 2.3.1.3 Purposes 2.3.1.4 Application and Utilization 3. Development Tools 3.1 Introduction 3.2 OPEN CASCADE 3.2.1 Structure 3.2.1.1 Foundation Classes 3.2.1.2 Modeling Data 3.2.1.3 Modeling Algorithms 3.2.1.4 Visualization 3.2.1.5 Data Exchange 4. Overall Program Structure 4.1 Introduction 4.2 Class Structure 4.2 Output Screen 5. Main Functions of welding material quantity Estimation 5.1 Shape Information Input 5.2 Extraction of Welding Seam 5.3 Determination of Joint Type 5.4 Establishment of Assembly Stage 5.5 Determination of Welding Posture 5.6 Calculation of Leg Length 5.7 Determination of Welding Methods 5.8 Determination of Improved Shape 5.9 Calculation of Pass Number 5.10 Estimation of Material Quantity 6. Example 7. Conclusions | - |
dc.format.extent | 40 | - |
dc.language | eng | - |
dc.publisher | 한국해양대학교 해양과학기술전문대학원 | - |
dc.title | 3차원 형상정보를 활용한 설계초기단계 선박용접물량 산출 | - |
dc.type | Dissertation | - |
dc.date.awarded | 2017-02 | - |
dc.contributor.department | 해양과학기술전문대학원 해양과학기술융합학과 | - |
dc.description.degree | Master | - |
dc.subject.keyword | 용접물량, 형상정보, 조립시뮬레이션, 생산정보 | - |
dc.type.local | Text | - |
dc.identifier.holdings | 000000001979▲000000006780▲000002331204▲ | - |
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.