마스터 크램핑 시스템에 의한 해상풍력 탑사이드 설비의 설치공법에 관한 연구
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 양무석 | - |
dc.date.accessioned | 2017-02-22T06:02:39Z | - |
dc.date.available | 2017-02-22T06:02:39Z | - |
dc.date.issued | 2015 | - |
dc.date.submitted | 57097-01-20 | - |
dc.identifier.uri | http://kmou.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002226174 | ko_KR |
dc.identifier.uri | http://repository.kmou.ac.kr/handle/2014.oak/9001 | - |
dc.description.abstract | Abstract Investment in the wind power industry has gained in popularity over the last decade as a result of the reduction in the use of fossil fuel in order to combat environmental pollution. Coastal nations are especially interested in developing offshore wind farms as ‘Green energy’due to their location. Offshore wind farms are more expensive to build than onshore wind farms because of reasons like the construction cost of foundations, the extraneous transportation and installation methods and the high cost of purpose built capital equipment synonymous with offshore wind turbine projects. As the capacities of wind turbines have increased | - |
dc.description.abstract | Method Statement. | - |
dc.description.abstract | Developed technology | - |
dc.description.abstract | Topside Structure | - |
dc.description.abstract | Mast Clamping System | - |
dc.description.abstract | the weights, heights and volumes of the wind turbines have also consequently increased requiring an adaptation of the increased capacity installation equipment and relevant vessels in terms of transportation and installation capacities to suit the additional requirements. This situation creates many different alternative installation method statements that can increase or decrease the transportation and installation performance. Therefore, it is necessary to develop a new method statement for the installation of offshore wind turbine topside structures such as, ‘The Method Statement for the Installation of Offshore Wind Turbine Topside Structure by using Mast Clamping System'. This method statement shall ensure that the work is executed safely and efficiently and may potentially reduce the project construction period and save the project cost by utilizing this developed technology effectively. KEY WORDS: Offshore Wind Turbine | - |
dc.description.tableofcontents | 목 차 List of Figures ⅳ List of Tables ⅴ Abstract ⅵ 제 1 장 서론 1.1 연구의 배경 1 1.2 연구의 목적 3 1.3 연구 방법 5 제 2 장 풍력 설비 개요 2.1 해상 풍력발전 설비 개요 7 2.2 해상 풍력발전 설비의 해양 환경 조건 8 2.3 해상 풍력발전 설비의 지지구조물 형식 9 2.3.1 격자 트러스 형식 자켓 구조 12 2.3.2 모노파일(Monopile) 형식 13 2.3.3 중력식 구조물(GBS, Gravity Based Structure) 14 2.3.4 부유식과 유연식 14 제 3 장 해상 풍력설비 설치 공법 3.1 풍력 에너지 및 설비 일반 16 3.2 해상 설치공법 검토내용 요약 21 3.3 상부구조물 설치공법 23 3.3.1 설치공법 검토 1안 24 3.3.2 설치공법 검토 2안 28 3.3.3 설치공법 검토 3안 30 3.3.4 설치공법 검토 4안(연구공법) 39 제 4 장 결과 해석 및 고찰 51 제 5 장 결론 55 감사의 글 56 참고문헌 57 부록 A 58 | - |
dc.language | kor | - |
dc.publisher | 한국해양대학교 해사산업대학원 | - |
dc.title | 마스터 크램핑 시스템에 의한 해상풍력 탑사이드 설비의 설치공법에 관한 연구 | - |
dc.title.alternative | A Study on the Method Statement for the Installation of Offshore Wind Turbine Topside Structure by using Mast Clamping System | - |
dc.type | Thesis | - |
dc.date.awarded | 2016-02 | - |
dc.contributor.alternativeName | Yang museok | - |
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.