Detailed Information
- Title
- 배관재 설치 관리 시스템 개발에 관한 연구
- Author(s)
- 최재호
- Keyword
- 배관재, 관리시스템, 설치 순서, 계획, 알고리즘, Spool; Management system; Installation sequence; Planning; Algorithm
- Issued Date
- 2019
- Publisher
- 한국해양대학교 대학원
- URI
- http://repository.kmou.ac.kr/handle/2014.oak/11806
http://kmou.dcollection.net/common/orgView/200000176530
- Abstract
- In the mid-2000s, Large shipyards in South Korea expanded their business area from common vessel to offshore plant based on outstanding shipbuilding ability of common vessel area. However, due to a lack of understanding about the offshore plant area, these shipyards suffered huge losses. The differences between offshore plant area and common vessel area include the characteristic of the business, the importance of engineering capability, the contract method, the rate of outfitting. In this study, I tried to solve problems arising from the high outfitting rate of the offshore plant from the perspective of production management. In this study, I developed the spool installation management system considering only spools among many types of outfittings. In the spool installation management system, the algorithm for optimizing the installation sequence of spools and the algorithm for spool installation planning are included. Also, verification of the developed system was performed through execution of simulation to verify the plan established through the developed system.
-
Appears in Collections:
- 조선해양시스템공학과 > Thesis
- Files in This Item:
-
배관재 설치 관리 시스템 개발에 관한 연구.pdf
Download
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.